Gaddesden Infant School

Venue: Gaddesden Infant School

Timescale: 2-3 weeks

Brief:

To convert an existing adult washroom and adjacent cupboard into a single washroom for infant use. In addition to this, a face lift for the existing Disabled Washroom was also required, making it DOC M compliant and giving it a more modern feel.

Specification

  • IGLOOS Create cubicle system from Education range
  • Melamine Faced Moisture Resistant Chipboard Cubicle System
  • Wall Mounted Wash Hand Basins

Design

  • Bright and colourful design
  • Water and energy saving features
  • Low-level WC Pans
  • Low-level WC Cubicles offering additional passive supervision by adults
  • Altro Xpress Lay safety flooring
  • Safe and secure

Installation:

  • Full rip-out and Installation
  • All work carried out during school holidays

Before refurbishment cubicle

After refurbishment children's washroom cubicles

Disabled toilet conforming to Doc M regulations Wall mounted children's hand basins Low level children's toilet pans

IWRCS13_Gaddesden_Infant_School.pdf

You are here: Permanent Washroom Solutions Case Studies Gaddesden Infant School