Henry J Beans Bar

 

Venue - Henry J Beans Bar

Timescale - 4 weeks

Brief
To re-design and refurbish the female and male washroom areas of this trendy London bar. They must be of high quality finish, easy to maintain and overall enhance the customer experience.

Specification

  • Metal Cubicle Frame system
  • Compact Grade Laminate panel materials
  • Solid Surface vanity units with integrated basins
  • Non Concussive taps
  • Polysafe Corona Flooring
  • Secured toilet roll holders

Design

  • Robust and durable
  • Aesthetically pleasing
  • Security conscious
  • Water and energy savings

Installation

  • Out of hours installation

"Functional clean and much much better. Our loo’s aren’t designs that are special!" Nick Tamblyn, Kornicis

Before refurbishment
Solid surface vanity units with integrated hand basins and non concussive taps
Compact Grade Laminate Panels on Polysafe Corona flooring with secured toilet roll holders Metal Cubicle Frame system with Compact Grade Laminate panels

IWRCS02_Henry_J_Beans.pdf

You are here: Permanent Washroom Solutions Case Studies Henry J Beans Bar