Date: July – August 2012

Venue: Eton Dorney, Dorney Lake, Windsor

Timescale : 2 days interior fit-out

Brief: To supply temporary loos for hospitality area for the rowing events at Dorney Lake in a double decker structure. The loos to be designed to create a contemporary washroom befitting such a prestigious event whilst engaging with the surroundings of the sporting venue.

Solution: IGLOOS installed its Panelled range of oak vanity tops with glass bowl hand basins to fit the nautical New England theme of the hospitality enclosure. The cubicles matched the style with maple doors and ivory walling. Loos were constructed on ground floor only for ease of access. Large mirrors above the hand basins and tall dressing room style mirrors helped create a greater sense of depth within each room. To meet health and safety requirements ambulant cubicles within each room had out wards opening doors and grab rails. Inline with water board guidelines all taps were WRAS approved. IGLOOS installed all hand dryers.The client provided all enclosing walling, outer doors, lino flooring and a solid ceiling, however, IGLOOS can also supply these elements when required.

Total installed: WCS x 7, Urinals x 4, Hand basins x 9, Ambulant cubicles x 2, Enlarged cubicle x 1, Unisex Disabled Cubicle x 1

Eton Dorney, Dorney Lake, Windsor

Eton Dorney, Dorney Lake, Windsor

Eton Dorney, Dorney Lake, Windsor

Eton Dorney, Dorney Lake, Windsor

IECS15 Eton Dorney Olympic Venue.pdf

You are here: Temporary Event Solutions Case Studies Eton Dorney, Dorney Lake, Windsor