Temporary Case Studies

Greenwich Park

Date: July – August 2012

Venue: Greenwich Park

Timescale : 5 days interior fit-out

Brief: To supply temporary loos for hospitality areas for the equestrian events at Greenwich Park in a double decker structure. The loos to be designed to create a contemporary washroom befitting such a prestigious event whilst engaging with the surroundings of the sporting venue.

Solution: IGLOOS installed its Panelled range of Zeal style dark wood vanity tops and cubicle doors. White porcelain slipper style hand basins with chrome taps and fittings complemented the countertops. Large mirrors above the hand basins and tall dressing room style mirrors helped create a greater sense of depth with in each room. To meet health and safety requirements ambulant cubicles within each room had outwards opening doors and grab rails. In line with waterboard guidelines all taps were WRAS approved. IGLOOS installed all hand dryers. The client provided all enclosing walling, outer doors, lino flooring and a solid ceiling, however, IGLOOS can also supply these elements when required. IGLOOS provided all ivory cubicle walling to match.

Total installed: WCs x 11, Urinals x 7, Hand basins x 17, Ambulant cubicles x 4, Enlarged cubicles x 2, Unisex Disabled Cubicles x 2

Greenwich Park

Greenwich Park

Greenwich Park

Eton Dorney, Dorney Lake, Windsor