Horse Guards Parade Athletes and the Mall, Central London

Date: July – August 2012

Venue: Horse Guards Parade Athletes and the Mall, Central London

Timescale : 10 days interior fit-out

Brief: To supply temporary loos, showering, changing and medical areas for the Athletes and other users at the beach volley ball events at Horse Guards Parade and the Mall. These were to include disabled access facilities, cubicles and hand basins suitable for doping rooms and medical areas with all equipment unbranded.

Solution: IGLOOS installed its Panelled range of practical hand basins, cubicles and showers across 16 locations. In some areas IGLOOS provided all enclosing walling for the rooms and outer doors. In others walling just for the showers and cubicles was installed. Hand basins were selected with either non-concussive taps for medical rooms or lever taps suitable for disabled areas. The areas had to be highly practical for medical use for athletes and spectator emergency care as well as fordopingtesting. Insomeareastheloosand showers were connected to mains water and drainagesystems. Wherethiswasnotpossible IGLOOSinstalledvacuumtanksandpumps. As well as the loos and hand basins, IGLOOS also provided showers and created changing areas for the athletes all built inside the temporary structures. UnderneaththeGrandstandseating for the event IGLOOS installed Disabled Loo Modules for use by spectators.

Total installed: WCs x 20 , Hand basins x 25, Showers x 16, Disabled cubicles x 5, Disabled showers x 2, Disabled Loo Modules x 8

Horse Guards Parade Hospitality Olympic Venue

Horse Guards Parade Hospitality Olympic Venue

Horse Guards Parade Hospitality Olympic Venue

Horse Guards Parade Hospitality Olympic Venue

IECS14 Horse Guards Parade Athletes and the Mall Olympic Venue.pdf

You are here: Temporary Event Solutions Case Studies Horse Guards Parade Athletes and the Mall, Central London