Temporary Case Studies

London Restaurant

Panelled toilet system special design external view

Brief - To create a temporary loo solution while the res- taurant had their existing loos refurbished.

Solution - The schedule for this project was tight and we had to be flexible in our timings to run concurrently with the perma- nent loos project.

Due to the unusual structure we had to cut the panels to fit the arched roof and we had to create a suitable solution for removal of waste as the drainage point was not close to the vaults and being in the basement we had to pump up and out. To do this we used a dual macerator pump solution to liquefy the waste prior to pumping out through smaller pipes. The ladies and gents loos were in two separate vaults with waste and water pipes connected via an adjoining door way.

Testimonial - "The temporary toilets that you fitted over our two week period were very well received by all of our custom- ers who, incidentally thought that they were the new, perma- nent replacements for our restaurant! Also please pass on my thanks to your team who were extremely professional, their work was completed without any fuss at all and the business interruption was minimal." Carlos Swinton Lee, CGC

Panelled toilet cubicle with porthole doors

Panelled hand basins and urinals in restaurant refurbishment

Restaurant refurbishment overview

Panelled toilet back of house during refurbishment

IECS04_London_Restaurant.pdf

You are here: Temporary Event Solutions Case Studies London Restaurant